HUAWEI CDMA BTS 3606 PDF

Tojora Page 43 5 M6x20 combined screw Figure Installing a cabinet on the antistatic floor Figure hts how to install a BTS cabinet on the floor without sufficient bearing capacity. For the proper storage, use and disposal of this product, national laws and regulations must be observed. Watch out for the sharp edges on the RF fan panel during btx installation of RF cables lest it hurt your fingers. Other Cables The power cable and the grounding cable are routed straight and bundled neatly. Thus, you do not need to install these cables on site.

Author:Gataur Daijas
Country:Turks & Caicos Islands
Language:English (Spanish)
Genre:Video
Published (Last):25 October 2005
Pages:177
PDF File Size:9.58 Mb
ePub File Size:2.53 Mb
ISBN:352-4-14996-119-1
Downloads:53621
Price:Free* [*Free Regsitration Required]
Uploader:Shakanos



Administration Building, Huawei Technologies Co. The color of the coat must be the same as or similar to that of the cabinet. No field installation of the fan box is required. Paint the whole support with rustproof coat and top-coat. Please feel free to contact our local office or company headquarters. Page 14 — Power Supply Conditions of the Equipment The following items must be checked Lead the bolts through the lower support.

Do not put the wooden case upside down. This section introduces how to install the power module and what to pay attention during the installation. When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework.

To locate the support at the side of antistatic floor, proceed as follows: Enter text from picture: Means a complementary description. Determine the length of the grounding cables according to their actual cabling path, that is, the route from the binding post of BTS cabinet to the wiring holes of the grounding protection bar of the cabinet.

Figure shows how to install a BTS cabinet on the cement floor. Select and release the primary mouse button without Click moving the pointer. To remove cabinet doors, do it in a reverse order. Cut the tapes along the seams of the carton cover using a knife. The sectional area is Figure illustrates the positions of installation holes for U-bar supports.

The packing case is in good condition. Connect the other end to the DB9 socket of the power backplane. Chapter 4 Installing Cables Thus, you do not need to install these cables on site. That is, 1 m 39 in. Outline Figure shows the outline of the lower support. It is divided into six chapters: Lead the cables into their corresponding cable-fixing troughs.

For the proper storage, use and disposal of this product, national laws and regulations must be observed.

Insert the boards according to the names on the relevant nameplates to avoid any mistake. Comments to this Manuals Your Name. Tighten the bolts at the front face of the cabinet. The BTS in the multi-channel mode does not support the power synthesis function. Align the holes on the antistatic floor with the connecting holes cdmma the support.

Connect the two probes to the paint-free place of the base and the expansion bolt. Btd cases are generally used to pack heavy objects like racks, batteries, and so on.

Do not bend an optical fiber to a right angle upon distribution. When installing the RF cable, connect unused connectors to matching load and secure them. Installing Or Removing Side Huaweei 3. The last section also explains how to install cabinet assemblies on the cement floor without sufficient bearing capacity. Tools The following tools are required: The cabinet is placed upside down.

When handling the cabinet, hold on the solid places such as the upper cable rack or bone frame. Otherwise, the equipment will suffer severe damages. Positioning the Cabinet and Removing the Floor Caution: Chapter 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS huzwei.

TOP 10 Related.

BAUERNSKAT REGELN PDF

Huawei BTS3606 Installation Manual

Administration Building, Huawei Technologies Co. The color of the coat must be the same as or similar to that of the cabinet. No field installation of the fan box is required. Paint the whole support with rustproof coat and top-coat.

35 AKHRI PATH PDF

BTS3900 GSM

The power cable and the grounding cable are routed straight and bundled neatly. Enter text from picture: The depth of the hole must range from 52 mm 2 in. Page 43 5 M6x20 combined screw Figure Installing a cabinet on the antistatic floor Figure shows how to install a BTS cabinet on the floor without sufficient bearing capacity. This chapter describes how to install and use these two types of DDF. No field installation of the fan box is required. Loosen the screw in the small round hole hhawei as —48V connecting hole on the power input side of the terminal block using a flat-head screwdriver.

Related Articles